Quotation Marks"FVHD has worked with the Central Bucks School District on a variety of projects over the past 12 years. Projects included the complete renovation of two late 1950's era middle schools and transforming them with additions and renovations into 130,000 sq. ft. contemporary learning environments that will last well into the future. The additions at each school provided new office and learning spaces that added to the building's character as well as provided needed functional space. We have been impressed by FVHD's knowledge of the educational facilities field and their creative solutions to design issues as well as attention to details. If and/or when you move ahead with a project requiring professional design services, I would respectfully recommend that FVHD Architects be seriously considered to provide those services."

Kenneth A. Rodemer, AIA

Assistant Director of Operations

Central Bucks School District

Other "Middle Schools" Projects
  • Partial Roofing Replacement at Marlboro MS for Marlboro Twp. SD
  • Rehab & Upgrades of Locker Rooms at Matawan Reg. HS and Matawan-Aberdeen MS REBID (#3 HVAC ONLY)
  • Generator Rpl. at Conover Rd. ES; Generator Rpl. at Cedar Dr. MS; & Boiler Rpl. at Cedar Dr. MS
  • Library Roof Rpl. at Joseph J. Catena ES and Clifton T. Barkalow MS, Freehold Twp., Monmouth Co., NJ
  • REBID Partial Roof Replacement at Clearview Reg. MS and EPDM Warranty Extension at Clearview Reg. HS
  • Exterior Door Replacement at Indian Mills Memorial Middle School for Shamong Twp., Burlington Co.
  • Clock System Replacement at Community Middle School for the WWP Reg. SD, Mercer Co., NJ
  • REBID HVAC & Ceiling Renovations at Eugene A. Tighe Middle School, Margate, NJ
  • Core Space HVAC Upgrades at Various Schools for Lawrence Twp. Public Schools, Mercer Co., NJ
  • Masonry Repointing and Waterproofing at Marlboro Middle School
 
 
 
© 2017 Fraytak Veisz Hopkins Duthie, P.C.   |   New Jersey   |   Pennsylvania