Project Name: | Paving and Site Drainage at Oakcrest High School |
Project Owner: | Greater Egg Harbor Regional High School District |
FVHD Project Number: | 5369-2A |
Project Location: | 1824 Dr. Dennis Foreman Drive, Mays Landing, NJ 08330 |
Pre-Bid Meeting Date: | Wednesday, May 31, 2023 |
Pre-Bid Meeting Time/Location: | 1:00 PM / Contractors should meet in the lobby of Oakcrest High School, 1824 Dr. Dennis Foreman Drive, Mays Landing, NJ 08330. All prospective bidders are encouraged to attend. |
Bid Due Date: | Wednesday, June 21, 2023 |
Bid Due Time/Location: | 2:00 PM / Greater Egg Harbor Regional High School District Board of Education, 1824 Dr. Dennis Foreman Dr., Mays Landing, NJ 08330. |
Addenda Issued: | Addendum No. 1 issued June 1, 2023Addendum No. 2 issued June 8, 2023
CLICK THE LINK BELOW TO ACCESS ADDENDA / CLARIFICATIONS FOR DOWNLOAD: (DISCLAIMER: All qualified bidders/contractors intent on submitting a bid proposal for this project are required to register their company with, and obtain original bid documents from, Fraytak Veisz Hopkins Duthie, PC (FVHD) Architects-Planners, 1515 Lower Ferry Road, Trenton, New Jersey 08618, (609) 883-7101. The bid documents are the intellectual property of FVHD and are copyright protected. Obtaining bid documents from any other source may result in incorrect or incomplete information. Failure to comply with this bidding requirement may result in the submission of a bid proposal based on incorrect or incomplete bid documents for which the bidder is solely responsible.)
|
Contract(s): | Single Overall Contract (C054 with C059, or C059 with C054, or C009) |
Project Description: | New Handicapped Parking at MP Field: Similar to new stadium parking but on the other side of the access road. New Handicapped Parking at Stadium: Access road from Dr. Dennis Forman Dr. and handicapped parking only, no standard parking stalls, including associated walkways to bleachers. Paved Walkways to Stadium: Existing sand/dirt walking paths, and additional paving around outbuilding, including paths to existing building exterior doors. Repair Outfall from South Parking: Solve drainage/erosion problem. |
Estimated Project Cost: | Greater Egg Harbor Reg. HS District does not post cost estimates. |
Contract Document Cost: | Free electronic download of bidding package is available for this project if you email a completed registration form to info@fvhdpc.com
Registration forms can be downloaded from the top of this page: https://fvhdpc.com/bids/bidlisting
Bid Sets can also be purchased on DVD ($25) or as a hard copy set ($250).
You can indicate on the registration form which way you’d like to receive the bid set.
|
FVHD Contact: | All requests for information (RFI) must be submitted in writing by June 8, 2023, and sent by emailing
cwoodward@fvhdpc.com, or faxing 609-883-2694, or via common carrier to the Architect. All
correspondence must include the Architect Project Name and Project Number referenced. The Architect is
not responsible for misdirected or misrouted correspondence. |