Project Name: | Pre-Purchase Equipment for Boiler Replacement at Freehold Reg. High School Dist. Board of Education |
Project Owner: | Freehold Regional High School District |
FVHD Project Number: | 5461A |
Project Location: | 11 Pine Street, Englishtown, NJ 07726 |
Bid Due Date: | Thursday, March 23, 2023 |
Bid Due Time/Location: | 2:00 PM / Freehold Regional Board of Education, 11 Pine Street, Englishtown, NJ 07726. |
Addenda Issued: | Clarification No. 1 issued March 20, 2023
5461A_CLARIFICATION |
Contract(s): | Single Overall Contract – Boiler Equipment |
Project Description: | This project consists of Pre-Purchasing and delivering to the site a Gas Fired Sectional Steam Boiler and Burner with manufacturers localized controls for the Freehold Regional High School District. Included with this project are Pre-Purchase’s for associated Steam Condensate Pump, Steam Boiler Blow Down, and Steam Boiler Feed Water Pump. |
Contract Document Cost: | Free electronic download of bidding package is available for this project if you email a completed registration form to info@fvhdpc.com
Registration forms can be downloaded from the top of this page: https://fvhdpc.com/bids/bidlisting
Bid Sets can also be purchased on DVD ($25) or as a hard copy set ($100).
You can indicate on the registration form which way you’d like to receive the bid set. |
FVHD Contact: | Jason Dubowitch (see below for RFI procedure) |
Additional Information: | All requests for information (RFI) must be submitted in writing by March 13, 2023, and sent by emailing cwoodward@fvhdpc.com, or by faxing to 609-883-2694 or via common carrier to the Architect. All correspondence must include the Architect Project Name and Project Number referenced. The Architect is not responsible for misdirected or misrouted correspondence.
Project Start: 4/21/2023 Equipment Delivery/Substantial Completion: 7/17/2023 Final Completion: 8/16/2023
|