Project Name: | Boiler Replacement at Freehold Regional High School District Board of Education Office |
Project Owner: | Freehold Regional High School District |
FVHD Project Number: | 5461 |
Project Location: | 11 Pine Street, Englishtown, NJ 07726 |
Pre-Bid Meeting Date: | Wednesday, April 5, 2023 |
Pre-Bid Meeting Time/Location: | 2:00 PM at the Freehold Regional Board of Education Office, 11 Pine Street, Englishtown, NJ 07726 |
Bid Due Date: | Friday, April 21, 2023 |
Bid Due Time/Location: | 2:00 PM to the Freehold Regional Board of Education, 11 Pine Street, Englishtown, NJ 07726 |
Contract(s): | Single Overall Contract DPMC Classifications: C032 Prime with C047 Subcontractor |
Project Description: | Provide and install the boiler replacement and all associated work at the Freehold Regional High School District Office. Heating, ventilating, and air conditioning system equipment, including all work in accordance with drawings and specifications. Also includes both administrative and coordination responsibilities. HVACR Contractor is responsible for all coordination between his/her work and work of all Subcontractors. Work shall include preparation of shop drawings, pre-purchase the indicated HVACR equipment and deliver to the school, as indicated in the Contract Documents. |
Contract Document Cost: | No fee electronically, $25.00 DVD, $250.00 hard copy. Check or money order payable to Fraytak Veisz Hopkins Duthie, P.C. If Contractor requests shipping, a direct shipping account number (FedEx or UPS) and preferred shipping speed must be provided and for paper sets, a separate fee of $25.00 per set. All fees are non-refundable. |
FVHD Contact: | All requests for information (RFI) must be submitted in writing by April 11, 2023, and sent by emailing cwoodward@fvhdpc.com, or by faxing to 609-883-2694 or via common carrier to the Architect. All correspondence must include the Architect Project Name and Project Number referenced. The Architect is not responsible for misdirected or misrouted correspondence. |
Additional Information: | Physical Start on or about June 19, 2023; Substantial Completion on or about October 13, 2023; Final Completion on or about November 13, 2023 |
Remarks: | Bid Documents for the proposed Work are on file at the office of the Architect, Fraytak Veisz Hopkins Duthie, P.C., 1515 Lower Ferry Road, Trenton, NJ 08618, tel. 609.883.7101. To obtain Bid Documents, complete and submit the Bidder Registration form to info@fvhdpc.com, which can be download from https://fvhdpc.com/bids/bidlisting. |